Circular(Road)
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Testing of building, road & bridge construction material for PWD Uttarakhand for 2 years from LoI date, along with 6 labs approved by E-in-C, PWD Uttarakhand. | 18/12/2020 |
Accessible Version :
View(2 MB)
|
| Regarding bridges/foot bridges to be constructed by Public Works Department | 11/11/2020 |
Accessible Version :
View(2 MB)
|
| Conditions for supply of Road Furniture, Reflective Sheeting and Road Marking | 31/08/2020 |
Accessible Version :
View(1 MB)
|
| Regarding the use of bitumen emulsion etc. in various asphalting works under the Public Works Department. | 11/06/2020 |
Accessible Version :
View(77 KB)
|
| The Public Works Department orders geological investigations under its work, emphasizing the role of departmental geologists. Only departmental geologists should carry out these investigations. | 21/01/2020 |
Accessible Version :
View(343 KB)
|
| Plint Area Rates (2020) | 14/01/2020 |
Accessible Version :
View(3 MB)
|
| Regarding naming the roads of the state after the names of all the martyrs of Uttarakhand. | 08/11/2019 |
Accessible Version :
View(2 MB)
|
| Regarding renewal approval by BC for state roads under the item of renewal of routes under the annual maintenance year 2019-20. | 07/05/2019 |
Accessible Version :
View(243 KB)
|
| Regarding construction works of roads/bridges under Public Works Department | 12/02/2019 |
Accessible Version :
View(340 KB)
|
| Grievance dated 26-09-2018 from Shri Nitant Walia Regarding Speed Breakers- reg | 30/10/2018 |
Accessible Version :
View(3 MB)
|
| Regarding using the products of Anti Strip Compound as per requirement. | 17/10/2018 |
Accessible Version :
View(262 KB)
|
| Regarding approvals of construction works under Public Works Department | 18/04/2018 |
Accessible Version :
View(370 KB)
|