Circular(Road)
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Cutting charges rates for roads under Public Works Dept by Telecom, Electricity Dept, Water Institute, Jal Nigam & other bodies | 22/09/2016 |
Accessible Version :
View(4 MB)
|
| Regarding the role of departmental engineers when the work of preparing DPR for road works is done through consultants. | 08/02/2016 |
Accessible Version :
View(924 KB)
|
| Guidelines Regarding Survey, Geo-investigation, Design, and DPR preparation through outsourcing. | 14/01/2016 |
Accessible Version :
View(1 MB)
|
| Just Released New IRC Publications. | 01/08/2015 |
Accessible Version :
View(917 KB)
|
| Regarding approval of new works under the Public Works Department | 23/07/2015 |
Accessible Version :
View(838 KB)
|
| Per KM Rates | 12/05/2015 |
Accessible Version :
View(2 MB)
|
| Regarding the formation of TAC | 30/03/2015 |
Accessible Version :
View(307 KB)
|
| About TAC | 24/02/2015 |
Accessible Version :
View(304 KB)
|
| About TAC | 24/02/2015 |
Accessible Version :
View(304 KB)
|
| Regarding Re-Surfacing / Strengthening of roads. | 03/12/2014 |
Accessible Version :
View(228 KB)
|
| Regarding carrying out crack sealing work on roads by Stress Absorbing Membrance (SAM). | 03/12/2014 |
Accessible Version :
View(556 KB)
|
| Regarding the use of cold mix technology. | 01/12/2014 |
Accessible Version :
View(3 MB)
|