G.O. (Planning, Design & Quality Control)
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Instructions for making proposals regarding the works of district planning | 23/04/2018 |
Accessible Version :
View(2 MB)
|
| Efforts should be made to procure the maximum required quantity in one go to take advantage of constant rates; the requirement should not be split into smaller parts to reduce cost or avoid approval. | 05/02/2018 |
Accessible Version :
View(1 MB)
|
| Regarding dividing one work into two to three parts instead of simultaneous procurement in cases of road cutting to the Public Works Department | 29/11/2017 |
Accessible Version :
View(529 KB)
|
| Regarding the arrangement for ensuring quality of work in the construction of motor roads/bridges within the state | 29/08/2014 |
Accessible Version :
View(848 KB)
|
| Inspection of works by officers to ensure quality of construction work of roads/bridges within the state | 03/07/2014 |
Accessible Version :
View(473 KB)
|
| Inspection of works by administrative officers to ensure quality of construction work of roads/bridges within the state | 03/07/2014 |
Accessible Version :
View(662 KB)
|
| Regarding the arrangement for ensuring the quality of construction work of motor roads/bridges within the state | 26/05/2014 |
Accessible Version :
View(3 MB)
|
| Acceptance of Single tenders for National Highways works | 27/04/2008 |
Accessible Version :
View(216 KB)
|