Circular (Estimate / SOR)
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Guidelines for preparation and implementation of road safety engineering works proposals on State Roads under Central Government | 13/02/2017 |
Accessible Version :
View(1 MB)
|
| Guide lines regarding preparation of revised estimate under the Public Works Department. | 14/10/2016 |
Accessible Version :
View(1 MB)
|
| Regarding change of IP/URL used for Central Schedule of Rates. | 23/06/2016 |
Accessible Version :
View(963 KB)
|
| Regarding the role of departmental engineers when the work of preparing DPR of road works is done through consultant. | 08/02/2016 |
Accessible Version :
View(924 KB)
|
| Provisions for contingency and quality control in estimates. (1.4 MB) | 21/01/2016 |
Accessible Version :
View(1 MB)
|
| For fixation of responsibility: Regarding getting the survey, geo investigation design, DPR, vetting and supervision of bridges done by the same consultants and other points related to it. | 14/01/2016 |
Accessible Version :
View(1 MB)
|
| Labour rates for works to be performed during winter (from 01 November to 30 April) and summer (from 01 May to 31 October) | 18/12/2015 |
Accessible Version :
View(1 MB)
|
| Fixed rates of horses and mules for the Kedarnath walking route from Sonprayag/Gaurikund for the travel season of year 2015 (in rupees for carrying material) | 18/12/2015 |
Accessible Version :
View(2 MB)
|
| Plinth Area Rates.(1.7 MB) | 20/08/2015 |
Accessible Version :
View(2 MB)
|
| Revised Central SOR for Financial Year 2016-17 effective date 01-05-2016 (5.1 MB) | 12/06/2015 |
Accessible Version :
View(5 MB)
|
| Amendment in SOR for the Financial Year 2015-16 (2.3 MB) | 02/05/2015 |
Accessible Version :
View(2 MB)
|
| Regarding formation of technical audit cell at regional engineer level for technical audit of construction work costing up to Rs. 5.00 crore. (1.4 MB) | 01/04/2015 |
Accessible Version :
View(714 KB)
|